Our Projects
Our Latest Projects
Atemco designs, manufactures, and installs bespoke modular buildings, tailored to the specific uses and constraints of each project.
Filters:
Administrative Extension of the Nanterre Penitentiary Center
A 665 m² two-story administrative extension, built in immediate proximity to the Nanterre penitentiary center.
Modular school complex in Épinay-sur-Seine
A 1,358 m² school complex comprising 61 modules, rapidly constructed on the footprint of a former gymnasium in Épinay-sur-Seine.
Teaching Facilities for Sorbonne Paris Nord University
Sixty modules across two levels providing 1,493 m² of educational facilities, delivered in time for the 2024 academic year.
Modular funeral home in Étais-la-Sauvin
A 350 m² modular funeral home, engineered to combine architectural restraint, welcoming facilities, and seamless landscape integration.
Classrooms at Lumière University Lyon 2
A 1,080 m² university complex featuring 38 modules, established at the heart of the Porte des Alpes campus in Bron.
Leisure center of the Pays de Fénelon
A 386.6 m² recreation center combining activities, dining, medical care, and administrative services within a single-story building.
Claude Chappe Elementary School in Chambray-lès-Tours
A 286 m² modular elementary school combining eleven new modules and two reused modules for the start of the 2023 school year.
Used vehicle offices for Renault Retail Group in Fresnes
A 30 m² module dedicated to office space for Renault Retail Group’s used vehicle operations in Fresnes.
Saran green waste collection facility reception unit
A compact 19.7 m² reception facility, delivered and installed to support operations at the Saran green waste site.
Family reception facility at the Fresnes correctional facility
A 165 m² reception facility providing families with a comfortable, functional space adjacent to the Fresnes penitentiary center.
Modular classrooms at Saint-Exupéry Middle School
Four modular classrooms over two levels, installed at Saint-Exupéry Middle School without disrupting school operations.
Sports Locker Rooms in Chambray-lès-Tours
Four sports locker rooms complete with showers and sanitary facilities, housed in a 114.6 m² modular building in Chambray-lès-Tours.
Bercadis Sales Office in Bergerac
A 115 m² modular sales office, designed to accommodate clients and commercial teams for Bercadis in Bergerac.
Temporary school complex in Évry-Courcouronnes
A temporary school complex of 40 modules over two levels, installed within the courtyard of the Jules Verne school and delivered for the start of the school year.
Modular after-school care facility in Maule
A 233.6 m² after-school care facility featuring a green roof, delivered as a turnkey package for the City of Maule.
Answering all your questions about modular construction
Questions & Answers
Because our modular buildings are full-fledged constructions: engineered foundations, factory-manufactured steel frames, insulation, and equipment strictly compliant with thermal regulations and public-access building (ERP) or labor code requirements. They are built to last—and, thanks to their modular nature, they are also designed to evolve: expanding, reconfiguring, or even relocating whenever usage demands.
Off-site construction saves valuable time: while the site is being prepared (foundations, utilities), your building is already being manufactured at our Mussidan plant. Lead times depend on project specifications, engineering studies, and permits; we commit to a precise schedule from the preliminary study phase, and our teams are accustomed to strict deadlines—a school complex must be delivered for the start of the school year, not after.
Yes. From the Dordogne region, Atemco designs, manufactures, and installs buildings across all of France—Île-de-France, Centre-Val de Loire, Auvergne-Rhône-Alpes, Nouvelle-Aquitaine…—and occasionally carries out international projects. Off-site factory manufacturing makes distance irrelevant: your building travels fully finished, and on-site assembly takes only a few days.
It is rooted in our heritage: for over a century in Mussidan, our plant has been manufacturing made-to-measure solutions—yesterday stairs and metal shutters, today complete buildings. We have no fixed catalog: every project is engineered to the exact specifications of your usage, your site, and your regulatory requirements, from the floor plan to the cladding finish.
Both. We deliver public-access buildings (ERP)—schools, universities, recreation centers, sports changing rooms, up to Category 3 ERP facilities—as well as commercial facilities governed by the French Labor Code: offices, industrial premises, and technical facilities. This dual regulatory expertise is your guarantee: your building complies with its operational requirements right from the design stage.
In three steps: outline your project via our quote request form; our engineering teams will review it and provide a proposal and schedule; then, a dedicated project manager will support you from initial engineering through to installation. You can also contact us directly at +33 (0)5 53 80 81 82.
